PUBLIC INFORMATION MEETINGS

PUBLIC INFORMATION MEETINGS #3 AND #4:
​FEBRUARY 4 AND FEBRUARY 6, 2025

KDOT held two public information meetings for its Randall Road Multimodal Improvements Project in February 2025. Travelers of Randall Road and residents of Elgin, Elgin Township, Dundee Township, Sleepy Hollow, West Dundee, Carpentersville and Algonquin were invited to attend one of the following two open houses to learn about and share feedback on proposed Randall Road multimodal improvements:
​
  • South meeting: Tuesday, February 4 from 5 to 7 p.m. at Elgin Community College Building E (1700 Spartan Drive, Elgin, IL 60123)
  • North meeting: Thursday, February 6 from 5 to 7 p.m. at Algonquin Village Hall (2200 Harnish Drive, Algonquin, IL 60102) ​​

​Members of the public could stop by any time during the events to view exhibits, ask questions and share comments. During both meetings, the project team shared identical information about the study, gathered input on proposed improvements and reviewed the next steps. Meeting materials can be viewed below.
SUBMIT PUBLIC COMMENT

MEETING EXHIBITS AND FACT SHEETS

Click on an image below to view the larger exhibit board or to download the Adobe Acrobat PDF file.
Picture
  • Project Study Area
Picture
  • Project Phases and Timeline
Picture
  • Existing Shared-Use Paths, Sidewalks and Bus Routes

Picture
  • Proposed Safety Enhancements
Picture
  • Tyler Creek Pedestrian Bridge (Elgin)
Picture
  • Environmental Considerations

Picture
Proposed Improvements
Picture
Proposed Improvements (Technical Plans)

Picture
  • Meeting Fact Sheet (English)
Picture
  • Meeting Fact Sheet (Español)​

  • Presentation Script (English)
  • Presentation Script (Español)

PUBLIC INFORMATION MEETINGS #1 AND #2:
​SEPTEMBER 14 AND SEPTEMBER 20, 2023

KDOT held two public information meetings in September 2023 about the project: one in the south section of the study on September 14 and one in the north section on September 20. During both meetings, the project team shared the same information about the study, gathered public input and reviewed next steps. In case you were unable to attend one of the events, meeting materials are available for viewing below.  
Picture
Individuals in a meeting room gathered around an exhibit table

MEETING EXHIBITS AND FACT SHEETS

Click on an image below to view the larger exhibit board or to download the Adobe Acrobat PDF file.
Picture
  • Project Study Area​
Picture
  • Project Phases and Timeline​
Picture
  • Existing Conditions​

Picture
  • Environmental Considerations​
Picture
  • Traffic Conditions​
Picture
  • Public Transportation​

Picture
  • Existing Pedestrian and Bike Path Locations​
Picture
  • Potential Safety Enhancements​
Picture
  • Tyler Creek Bridge Improvements (Elgin)​

Picture
  • Connect With Us​
Picture
  • Project Fact Sheet: English​
Picture
  • Project Fact Sheet: Spanish​
Picture
A project of the Kane County Division of Transportation (KDOT)